Colorado Journeyman PrepStudy the book PSI hands you

Sources last checked 2026-11-13

Weld County

Greeley Electrician License: The City Contractor License Starting 2027

From 1 January 2027 the City of Greeley requires every contractor, specialty trades included, to hold a city contractor license before applying for permits or starting regulated work. The Building Inspection office holds the answers on fees and electrical steps.

Book open: try 30 free questions

Jump to
  1. What Greeley announced
  2. How the city license sits beside the state license
  3. Who inspects, and which code
  4. The test center
  5. Towns around Greeley
  6. Short answers
  7. Where the numbers come from

What Greeley announced

On 10 August 2026 the city announced that its Building Inspection Department will require contractors to hold a City of Greeley contractor license starting 1 January 2027. A contractor needs the license before applying for permits, starting construction, making alterations or repairs, or doing demolition that the department regulates.

The announcement says the rule covers all applicable trades, general contractors and specialty trade contractors included. Contractors may need to show proof of licensing during a project, and a contractor without a valid city license may be denied a permit or ordered to stop work.

For fees, license categories and anything specific to electricians, call the Building Inspection office at 970-350-9830.

How the city license sits beside the state license

Colorado licenses electricians through the State Electrical Board, and the license path page walks the apprentice, journeyman and master steps. Greeley's license starts in 2027 as a layer on top of those. Ask the city how it will treat a state master electrician's license and the state contractor registration, which the contractor page covers.

Who inspects, and which code

Greeley's building permits and inspections page lists electrical, gas, plumbing and sprinkler-system installation or modifications among the projects that may need a permit, and tells people to contact Building Inspection before starting work. Building Inspections is at 1100 10th Street, Greeley, CO 80631, open Monday through Friday, 7:00 AM to 5:00 PM, with appointments strongly recommended. The page links an online inspection request system.

The same page lists the 2023 National Electrical Code among the city's adopted codes. The State Electrical Board adopted the 2026 edition effective 1 August 2026, and the code page walks through that rule. With two official documents saying different things, ask Building Inspection which edition applies to your permit.

The test center

PSI's bulletin lists no test center in Greeley. The nearest site on the list is in Fort Collins, at 3000 S. College Ave, Suite 206, Fort Collins, CO 80525. The Fort Collins page covers that city's rules and the IEC Rocky Mountain campus there, and the test day page has all ten addresses and the ID rule.

The journeyman exam page has the format and fee, and the practice test gives you 30 free questions on the same pace. Log your hours as you work them, and check the hours and experience page for what the Board counts. The hours calculator works out the date you reach 8,000.

Towns around Greeley

Greeley has 114,363 residents by the 2024 Census estimate. The same estimate gives Windsor 41,734, Erie 38,594, Evans 22,394, Johnstown 20,639, Firestone 19,396, Frederick 17,937, Severance 11,554 and Fort Lupton 9,948.

The announcement covers the City of Greeley. Each of these towns is a separate place to ask about local permits and licensing. Fort Collins and Thornton are the nearest city pages on this site.

Short answers

Does Greeley require a contractor license for electricians?

From 1 January 2027 the city requires a Greeley contractor license for all applicable trades, specialty trade contractors included, before permits are issued. For the electrical details, call Building Inspection at 970-350-9830.

What does a Greeley contractor license cost?

The city's announcement doesn't state a fee. Building Inspection, at 970-350-9830, can give the current figure.

Which electrical code does Greeley use?

Greeley's permits page lists the 2023 National Electrical Code among its adopted codes, while the State Electrical Board adopted the 2026 edition effective 1 August 2026. Confirm with Building Inspection which edition applies to your permit.

Where is the nearest PSI test center to Greeley?

The Fort Collins site, 3000 S. College Ave, Suite 206, Fort Collins, CO 80525, is the nearest on the bulletin's list of ten.

Try it with the book open

30 free questions, every answer worked

Get one wrong and you see the arithmetic and the section number, so you can tell which step went sideways. You don’t need an account.

We wrote these questions for our electrician exam sites. Seven of the 500 cover Colorado’s own exam and license rules, and the other 493 also sit in the banks on our other state sites. None of them is a real exam question, and a question bank can’t guarantee anyone a pass.

Where the numbers come from

Colorado’s PSI exams are open book in a narrow sense: PSI sets a National Electrical Code and a formula page on your desk, forbids writing, highlighting, underlining or indexing in them, and lets you bring in no other materials. Questions have followed the 2026 edition since 1 August 2026, and PSI will provide the 2023 book on request until 1 December 2026.

We wrote every practice question on this site ourselves, and none of them is an actual exam question.

Colorado Journeyman Prep is independent. NFPA, the Colorado State Electrical Board, PSI and every licensing authority, school and union have no affiliation with it, and none of them endorses or sponsors it.

NEC and National Electrical Code are the National Fire Protection Association’s registered trademarks.

An email when Colorado’s exam rules change

The State Electrical Board keeps its exam and license rules in 3 CCR 710-1, and PSI’s candidate bulletin names the code book and the fees for each paper. If either one changes an exam rule, a fee or the code date, we send you an email saying what changed. Every email from us carries a link that takes you off the list in one click.